How to use Contractor Division
Written 18 November 2026. Each step names the button you press.
The short version: write the daily log the way you already do. When the log describes extra work, press Draft change order. You get a priced change order in which every line quotes the log you wrote. Check it, then approve it. Nothing is sent to anyone.
1. Make an account
Open the app, choose Sign Up, and enter your email and a password of 8 or more characters. No card. If you forget the password later, Forgot password? emails you a link that works once, for 30 minutes.
2. Add the job
Under Projects, press New Project. Give it a name, the address and the contract value. The Free plan holds 1 active project at a time; mark a job completed to free the slot for the next one.
3. Add your crew and their rates
Add each crew member with their trade and hourly rate. The change order drafter uses these rates for labor and marks those lines crew rate.
4. Write the daily log
Open Daily Logs and add the day's entry: weather, what was done, delays, deliveries. Write the facts you would want in a dispute: quantities, hours, who directed the change. For example: "Hit unsuitable fill at 3 ft along grid lines A-C; hauled off 3 truck loads. Excavator kept 2 extra days. Crew 18 labor hours on the extra dig."
5. Draft the change order from the log
On that log, press Draft change order. In about 15 seconds you see each line with the words from the log it came from, the quantity, the rate and the amount. How it works:
- Every line must quote the log word for word. A line the log does not support is left out, and the window tells you it was left out.
- Labor uses your crew's rates. Equipment and material rates the AI proposes are marked suggested; check them against your own numbers.
- The arithmetic (amounts, subtotal, 15% overhead and profit, total) is done by the software, not by the AI.
- The change order is saved as a draft. Nothing is sent.
Each draft uses one of the Free plan's 2 AI drafts a day. Pro has no daily limit.
6. Approve it
Press Open change orders, or go to Change Orders. Edit the draft if a rate or quantity needs changing, then press Approve. Approving adds the amount to the project's contract value and adds a budget line for it, once.
7. Keep subcontractor insurance current
Under Subcontractors, record each sub's insurance certificate (COI) expiry date and license number. The home screen warns you before a certificate expires and flags one that has.
8. Ask whether a job needs a permit
Permit AI answers from the published code for the City of Manvel and unincorporated Harris County, Texas, and links the section it read. It covers fences, sheds, carports and workshops, pools, driveways, fill and floodplain, signs and new houses. It does not file the permit and it is not the city. For any other city, use the request form; we email you when your city is covered.
9. Show the client where the job stands
On a project, press Share to make a link the client can open without an account. Anyone with the link can see that project's progress, so send it only to the client. Links expire after 90 days.
Plans
Free: 1 active project and 2 AI drafts a day. Pro: $99 a month, unlimited projects and AI drafts. See pricing, the terms and the privacy policy. Questions: hello@strategic-innovations.ai.